New hydraulic diesel CE certification hammer pile driver

FOB Reference Price:Get Latest Price
$10,000.00 - $20,000.00 / Sets | 1 Set/Sets (Min. Order)
Model Number:
Diesel hammer
Power:
High Efficiency
Shipping:
Support Sea freight · Land freight
Customization:
Customized logo (Min. Order: 1 Sets)
Customized packaging (Min. Order: 1 Sets)

More

Graphic customization (Min. Order: 1 Sets) Less
Report Suspicious Activity
Overview
Quick Details
Piling Speed(m/min):
2m/min
Efficiency:
High Efficiency
After-sales Service Provided:
Video technical support, Online support, Free spare parts, Field installation, commissioning and training, Field maintenance and repair service, No overseas service provided
Warranty:
1 Year
Applicable Industries:
Farms, Construction works , Energy & Mining
Condition:
New
Place of Origin:
Shandong, China
Brand Name:
DingLi
Weight:
3-5t
Dimension(L*W*H):
8000*2000*3000mm
Certification:
ISO9001/CE
Product Name:
CE certification hammer pile driver
Type:
Hydrualic
length:
6-8m
Application:
Pile Driving
breadth:
2-2.4m
The engine:
Weichai yuchai(Optional)
Front axle driving axle:
130/140-141
the cab:
single
Diesel quantity:
0.3-5t(Optional)
Supply Ability
Supply Ability:
50 Set/Sets per Month CE certification hammer pile driver
Packaging & Delivery
Packaging Details
according to the customer's requirements
Port
QingDao

    

New hydraulic diesel CE certification hammer pile driver

 

Product NameCE certification hammer pile driver
length6-8m(Optional)
breadth2-2.4m(Optional)
heigth2.9-3.3m(Optional)
The engineWeichai yuchai(Optional)
power110-150kw
Directionalhydraulic
tire825-16/900-20
Front axle driving axle130/140-141
The cabsingle
Diesel quantity0.3-5t(Optional)
Walk wayFree walk

Shandong DingLi construction Machinery Co., Ltd. is located in the south of Shandong Province, Mozi hometown - Tengzhou. Companies specializing in the production of crawler rotary drilling rig, wheeled rotary drilling rig and diesel hammer, photovoltaic piling machines and other construction machinery.
Full of rotary drilling rig to reliable quality, beautiful appearance, practical structure and thoughtful after-sales service, won the majority of users trust and praise, the products are exported to more than 30 provinces and cities nationwide and Australia, Myanmar, Sudan, Saudi Arabia More than 10 overseas countries and regions, involving a number of industries, and enjoy the "less investment, quick, buy from the use of good, high efficiency" reputation


 Maintenance:
1. Check whether the oil quantity is sufficient, make sure the oil quality is normal.
2. Check whether the gear oil of each reducer is sufficient, make sure the oil quality is normal.
3. Check whether there is oil leakage phenomenon, tighten the loose hose.
4. Check whether the lifting device is flexible and whether the internal butter is contaminated.
5. Check whether there are cracks, rust, out of soldering and other damage in the frame structure, tighten bolts.
6. Check the electrical wire, sensor, operation button handle and other working conditions.
7. Check whether the main and auxiliary wire rope has broken, and its connection is safe and reliable, and whether the strength of pressure rope equipment is sufficient.
8. Whether all transmission parts are fastened.
9. The engine hydraulic system will preheat for 5-20 minutes in advance, according to different climate, and check whether the instrument is normal.
10. After 100 hours of the first time work, release the Hydraulic Oil, and oil of the radiator, clean and replace the damaged filter, use 3.5 litres of diesel. Inject 160 litres of special hydraulic oil, after clean the tank (Requirements: Oil level must not less than 80% of the level gauge of the fuel tank, when stop the machine.)

 

FAQ

 

Q1: Are you a manufacturer?

A: Yes, our company was established in 1995. We are a professional Rotary Drilling Rig Manufacturer and have many years of technological exchange with Xozhou Heavy Industry Group.

 

Q2: What does your company produce? 

A: The main products of our company include Ground Hole Drilling Machine, Crawler Rotary Drilling Rig, Wheeled Rotary Drilling Rig and Diesel Hammer, Photovoltaic Piling Machines and other Construction Machinery, etc.

 

Q3: How about your delivery time?

A: Normally the delivery time is about 7-15 days. For some special case, we can make it within 2 weeks, which depends on different products.

 

Q4: What methods of payment do you accept?

A: We accept T/T, L/C, D/P, D/A, etc. Of course we can have a discussion for this.